Page 15 - ADG - Continuous Energy with Reliable Collaboration
P. 15

EXPLORATION AND
                                           PREPARATION OF
            CONTRACT                       THE PROJECT













            ELECTRICAL AND                 CONSTRUCTION
            MECHANICAL                     WORKS ON THE
            INSTALLATION                   TANK SITE










                                       UNLOADING OF THE TANK
                                       AND THE EQUIPMENT














            ACCEPTANCE OF THE                               TRAINING
            INTERNAL INSTALLATION                           AND
            OF NATURAL GAS                                  COMMISSIONING
            BY THE AUTHORIZED
            BODY
   10   11   12   13   14   15   16   17   18   19   20